From Drawing Review to Production and Delivery

Start with a drawing, sample, or application. We agree on material, pricing, and acceptance before toolmaking and production.

Standard Tooling to First Samples
Typically 35 to 40 days
Typical Sample Run
Usually 15 to 20 pieces

What to Confirm at Each Stage

  1. Receive Project Details

    Send available drawings, photos or sample details, the application, and estimated volumes. Sales confirms what you sent and asks for anything needed for review.

    Project information checklist
  2. Drawing Review and Itemized Quote

    Engineering reviews geometry, alloy, critical dimensions, and machining. Sales itemizes tooling and part prices and details packaging and delivery as needed.

    Itemized quotation and open points
  3. Toolmaking and Die Trial

    After the drawing revision and tooling concept are approved, we build and trial the die. Timing and sample quantity are confirmed for the project.

    First trial samples
  4. Sample Approval

    Verify dimensions, fit, appearance, and agreed operations. If the tool or finish needs adjustments, update the approval details and schedule.

    Sample approval and production acceptance requirements
  5. Production and Delivery

    We run to the approved samples and drawings and perform in-process and final inspection. Confirm packing, shipping documents, and handover arrangements together.

    Finished parts and agreed shipping documentation