Oven Door Handle Mount
Check the mounting holes, mating dimensions, and exposed surfaces on the door and handle.
View Part DetailsWe build dies and produce zinc castings at our Dongguan factory. Partner lines cast aluminum parts. Send your machining, finishing, assembly, and inspection requirements so Boyi can coordinate the work and reinspect before delivery.
Specify the grade on your drawing if known. If the alloy is open, share the application, operating environment, fit, and acceptance requirements.
| Material | Common Grades | Other Grades We Can Review | What to Provide |
|---|---|---|---|
| Zinc Alloy | Zamak 3、Zamak 5 | Zamak 2、Zamak 7 | Application, loading or assembly requirements, and any specified plating or appearance. |
| Aluminum Alloy | ADC12 | ADC1、ADC3、ADC10 | Weight or heat dissipation requirements, machined faces, surface finish, and material documentation. |
| Process | Press Configuration | Production Arrangement |
|---|---|---|
| Hot-Chamber Zinc Die Casting | One press each at 30, 88, 130, and 200 tonnes. An 18-tonne press handles some smaller parts. | Boyi builds and tries out dies and runs production in Dongguan. |
| Cold-Chamber Aluminum Die Casting | Two 160-tonne presses and one each at 280, 300, and 400 tonnes. | A partner casts the parts. Boyi coordinates subsequent operations and reinspects before delivery. |
Our tool shop has two EDM machines, one grinder, and two precision engraving machines. Routine secondary equipment handles milling, drilling, tapping, and deburring. Engineering selects the press and process based on part geometry, volume, and die condition.
We check material, geometry, and manufacturability before agreeing on quotation, first-sample, and shipment milestones.
Send drawings, alloy grade, application, initial and repeat volumes, and your target delivery date. Mark any interfaces or dimensions you still need to confirm.
Engineering assesses whether the part is suitable for die castingWe review new tooling, transfers, ejection, and secondary operations against the part geometry. We can usually quote a routine project within 36 hours when drawings, quantities, and requirements are complete.
Confirm tooling cost, unit price, and finishing scopeStandard tooling typically takes 35–40 days from toolmaking to first samples. We check the first samples against critical dimensions, fit, the appearance reference, and agreed tests.
Approve samples and inspection criteriaConfirm the drawing revision, batch size, packaging, and delivery dates. Changes to drawings, materials, or finishes may affect the quote, inspection plan, and schedule.
Reinspect and ship as agreed| Operation | Project Options | What to Specify on Drawings or Samples |
|---|---|---|
| Machining | Deburring, drilling, tapping, milling, and precision CNC machining when required. | Machined areas, locating datums, and finished tolerances. |
| Zinc Finishes | Polishing, nickel or chrome plating, e-coating, painting, and powder coating. | Appearance sample, color or gloss, cosmetic surfaces, and mask-off areas. |
| Aluminum Finishes | Painting and powder coating. Anodizing is assessed by alloy and sample. | Finish specification, contact and sealing faces, and inspection requirements. |
| Assembly | We agree on mating parts and assembly scope for each project. | Mating part revisions, clearance, travel, and functional checks. |
Compare parts by application, mounting, and finish to see what to specify for your quote and samples.
Check the mounting holes, mating dimensions, and exposed surfaces on the door and handle.
View Part Details
Confirm the slots, screw bosses, and clearance around the lock faceplate.
View Part Details
Approve the high-gloss finish against a physical sample and identify edges that may rub.
View Part Details
Identify the cooling fins, mounting holes, and mating faces that require machining.
View Part DetailsYes. Share the part application, weight or heat dissipation requirements, fit, and appearance criteria. We can evaluate the alloy, die, and secondary operations for each route.
Yes. Include the grade, material documentation, and operating environment so engineering can review the process against press capability, geometry, and volume.
We can review them for the project. Provide machining datums, finished tolerances, and mating part information. The quote can itemize the die, parts, and operations.
Identify the old and new drawing numbers, affected areas, and changes to material, interfaces, or finish. We can then review tooling, inspection, and lead time.
We typically reply initially within one business day. Routine projects with complete information can usually be quoted within 36 hours. Standard tooling typically takes 35–40 days to first samples. We confirm complex schedules after drawing review.