Custom Zinc Die Casting and Complex Tooling

We design, build, and try out dies in-house, then move to production once you approve the samples. Send your drawings or sample photos so our engineers can review the most challenging features first.

Presses and production stations in Boyi's die casting shop
Zamak 3 / 5Common zinc alloys
35 to 40 daysTypical lead time from toolmaking to first samples
Factory established
2004
Published part examples
20 parts
In-house hot-chamber presses
30–200 tonnes

About Boyi Industry

Based in Nancheng, Dongguan, Boyi builds custom dies and supplies finished zinc die castings to your drawings. Our published examples include kitchen, bath, and appliance hardware, locks and consumer electronics, musical instrument hardware, and decorative fittings.

Boyi Industrial company sign
Building 1, No. 5 Caotang Road, Nancheng, Dongguan, Guangdong, China
About Our Company and Factory

Engineering and Delivery

Complex Dies Built In-House
We design, build, and try out the dies at our own facility. Engineers review side holes, undercuts, and deep cavities for release and filling, then check fit and appearance on the samples.See a Die Design and Review Checklist
In-House Zinc Die Casting
Our 30-, 88-, 130-, and 200-tonne hot-chamber presses cover different part geometries and order volumes. We do routine secondary machining in-house and reinspect parts returned from partner operations before delivery.
Dimensional Reports with Samples
A typical sample run yields 15 to 20 parts. Dimensional reports are available with the samples. We schedule production after you approve critical dimensions, fit, and appearance.See a First-Article Inspection Example
Delivery Dates Agreed per Order
During quoting we check your target date and confirm the expected first samples, production lead time, and ship or pickup date. Production delivery follows the confirmed order.See How We Schedule Each Stage

Selected Customers

  • BIRD
  • Kweichow Moutai Group
  • M 1964
  • JWD Jingwah Digital
  • AUX
  • iJOY

Find Similar Die-Cast Parts

See which drawings and specifications to send based on the part’s function, mounting, and visible surfaces.

Browse 20 Published Part Examples
Kitchen, Bath & Appliances (8)
Bright silver grinder, antique brass grinder, oven door handle mount, two kettle handles, ice cream scoop, soap dish frame, and hardware fittings.
Locks & Consumer Electronics (4)
Switch backplate, keypad lock housing, fingerprint lock housing, and fingerprint lock handle.
Musical Instrument Hardware (4)
Large and small drum hoops and two instrument brackets.
Decorative Hardware (4)
Two alloy decorative pieces, a display base, and a metal frame.

The catalog includes variants in size and finish.

Parts, Tooling, and Finishing

We review alloy, critical dimensions, and appearance requirements before choosing the process. Send drawings for a new die or share details of a die you already have.

Explore Manufacturing Capabilities
Equipment, benches, and operators in Boyi's tool shop
Zinc Die Casting
Hot-chamber die casting, typically in Zamak 3 or Zamak 5.Cast In-House
Complex Die Casting Tooling
We review new dies and existing tools for transfer. Before a transfer, we check tool condition, previous samples, and press compatibility.In-House Tool Shop
Aluminum Die Casting
Typically ADC12, subject to drawing review.Partner Casting, Boyi Inspection
Secondary Operations and Finishing
Deburring, drilling, tapping, and polishing. We coordinate plating and coatings to your specifications.Boyi Coordinated and Inspected

Inspection from First Article to Shipment

  • First ArticleWe check critical dimensions, fit, and appearance against the approved drawing.
  • In ProcessWe record in-process checks, investigate deviations, and reinspect affected parts.
  • Finished PartsWe recheck dimensions, appearance, or packaging as agreed for the project.
See Four Inspection Record Examples

First-Article Dimensional Inspection

Anonymized Sample Record
CharacteristicDrawing RequirementSample ReadingsResult
Dimension A41.00 ± 0.1041.02 / 40.98Pass
Dimension B7.50 ± 0.057.48 / 7.52Pass
Measurements are in millimeters. This example illustrates the reporting format. Project tolerances follow the approved drawing.

Delivery Dates Confirmed with the Order

Include your target delivery date in the RFQ. We estimate first-sample and production milestones from the drawings, quantities, and finish requirements.

  1. Quote and Schedule

    We quote tooling and parts separately and confirm the expected first-sample date, production lead time, and delivery date.

  2. Toolmaking and First Samples

    Standard tooling typically takes 35 to 40 days from toolmaking to first samples. We schedule complex tooling according to geometry and trial plans.

  3. Sample Approval

    Both sides check dimensions, fit, and appearance. If a drawing or tool needs a change, we confirm the revised schedule together.

  4. Production and Delivery

    We run production, reinspect, pack, and ship or arrange pickup against the approved samples and order.

Let Our Engineers Review Your Part

Tell us what the part does, how many you need, and when you need them. Share any dimensions, tolerances, or finish requirements you already have.

Need an NDA First?
Email Boyi