How to Master Delivery Control in Die Casting

Learn how to master delivery control in die casting—from scheduling, process monitoring, capacity planning to quality assurance—with expert insights from Boyi Industry.

How to ensure on time delivery in die casting

1. Front-End Design Collaboration & Simulation Validation

• Concurrent Engineering Application: During the R&D phase, we initiate process feasibility analysis in parallel with design. By performing mold flow analysis (CAE), we can anticipate potential production risks in advance, reducing design changes after trial runs.

• Rapid Prototype Verification: Utilizing 3D printing technology to produce key part prototypes shortens the design validation cycle, ensuring a design-to-production capability match rate of ≥95%.

2. Information System Support

• Development of a proprietary production scheduling system tailored to the factory’s operations, enabling real-time scheduling adjustments and optimal resource allocation.

3. Deep Supply Chain Collaboration Management

• Supplier Collaboration: Establish a supplier delivery tracking mechanism, and evaluate suppliers through capacity availability assessments and On-Time In-Full (OTIF) performance scoring, selecting only stable and reliable partners.

• Joint Forecasting Mechanism: Share annual demand plans with the top three suppliers and implement Just-In-Time (JIT) cyclical deliveries to reduce material shortage risks.

4. Stringent Quality Control in Accordance with ISO Standards

• Quality is controlled strictly in compliance with ISO procedures, with rework time contingencies incorporated into production planning. A dynamic buffer coefficient is added to standard lead times based on historical rework rates.